Exit Signs Perth: Documentation & Testing Records Facility Managers Should Maintain

 Exit signs are a critical part of a building’s emergency evacuation system. They must remain visible, correctly positioned & capable of operating when the normal electricity supply fails. For facility managers responsible for emergency lighting Perth, maintaining accurate documentation is as important as arranging the physical inspection & testing of each fitting.

AS/NZS 2293.2:2019 sets requirements for the routine service & maintenance of emergency lighting and exit signs. Standards Australia describes the standard as covering periodic inspection and maintenance procedures intended to ensure emergency evacuation lighting systems remain ready for operation.

Why Exit Sign Records Matter

Testing records provide evidence that exit signs have been inspected, faults have been identified & corrective work has been completed. They also allow facility managers to monitor recurring failures, battery replacement cycles & areas where fittings may be obscured, damaged or affected by building changes.

Clear records support scheduled maintenance, contractor accountability, compliance inspections, repair budgeting, building handovers & verification that reported defects have been resolved.

Without an organised record system, a facility manager may know that testing occurred but be unable to confirm which fittings were tested, how long they operated, what defects were identified or whether failed units were retested after repair.

Maintain a Complete Exit Sign Asset Register

The asset register should be the central reference for every illuminated exit sign and emergency light within the facility. Each fitting should have a unique asset number that corresponds with the label attached to the unit.

The register should include:

  • Asset identification number
  • Building, floor, room or tenancy
  • Exact installation location
  • Fitting type & model
  • Manufacturer
  • Installation or commissioning date
  • Battery type
  • Replacement battery details
  • Circuit or distribution board reference
  • Warranty information
  • Current service status

Photographs can improve asset identification in large facilities, particularly where several signs are located within the same corridor, stairwell or open area. Floor plans should use the same numbering system as the asset register and contractor service reports.

Keep Installation & Commissioning Documents

Facility records should include the documents supplied when the emergency evacuation lighting system was installed, commissioned or altered.

Relevant records may include commissioning results, electrical certificates, approved building plans, product specifications, warranties & as-installed drawings.

These documents establish the system’s original configuration. They can help contractors determine whether later tenancy works, wall changes, door relocations or fit-outs have affected sign visibility, evacuation direction or system coverage.

When an exit sign is relocated, added or removed, the asset register, drawings & maintenance schedule should be updated at the same time. Waiting until the next annual inspection may create discrepancies between the physical system and its documentation.

Record Every Routine Test

Each routine service report should identify what was tested and the result for every asset. A general statement that the system passed provides limited information when future faults, compliance audits or insurance enquiries arise.

A practical testing record should capture:

  • Service date & time
  • Test type
  • Test duration
  • Technician’s name & company
  • Relevant competency or licence details
  • Asset numbers tested
  • Operating result
  • Battery or charging indicator status
  • Physical condition
  • Sign visibility & legibility
  • Obstructions or changed sightlines
  • Defects identified
  • Immediate corrective work
  • Outstanding repairs
  • Retest results
  • Next service date

The City of Perth’s public-building guidance summarises six-monthly checks that simulate a power failure and confirm that emergency lights and exit signs operate. It also describes a 12-month test involving a 90-minute simulated power failure, together with cleaning reflective surfaces and diffusers. Facility managers should ensure their service provider applies the current standard, building approval requirements & any site-specific obligations rather than relying only on an older summary guide.

Maintain a Defect & Corrective Action Register

Testing only reduces risk when failures are tracked through to completion. A separate defect register makes outstanding work visible and prevents faults from becoming buried within lengthy contractor reports.

Each defect entry should include:

  • Defect reference number
  • Related asset number
  • Date identified
  • Description of the issue
  • Priority rating
  • Temporary control measures
  • Responsible person or contractor
  • Target completion date
  • Repair date
  • Replacement parts used
  • Retest outcome
  • Final close-out approval

Common recorded issues may include failed batteries, damaged legends, incorrect directional arrows, faulty charging circuits, missing diffusers, poor illumination, physical damage & signs obscured by displays or new partitions.

Repairs should not be marked as complete until the affected fitting has been retested and the successful result has been recorded.

Infographic for facility managers: maintain records for exit signs Perth with icons for asset register, tests, defects, batteries, floor plans, and service reports.
Emergency Lighting Perth

Track Battery & Component Replacements

Battery replacement history can reveal patterns that are difficult to identify from individual service visits. For each battery change, record the asset number, battery specification, installation date, supplier, technician & reason for replacement.

Component records should also cover complete fittings, control equipment, diffusers, legends & charging components. This information supports lifecycle planning and helps facility managers determine whether repeated repairs remain cost-effective.

Where replacement units are selected from a range of Fire safety products Perth, product compatibility, approved application, operating performance & supporting documentation should be checked before installation.

Keep Plans, Evacuation Information & Sign Locations Aligned

Exit sign documentation should not be managed separately from the building’s wider evacuation information. It should align with evacuation diagrams, approved exits, fire compartments, door arrangements & paths of travel.

The City of Perth’s public-building guide states that exit signs must be illuminated with battery backup and positioned in accordance with building requirements. Western Australian health guidance also states that exit signs in public buildings must be installed in compliance with AS/NZS 2293.

Facility managers should review exit sign records after:

  • Tenancy alterations
  • Corridor or doorway changes
  • Refurbishment work
  • Installation of new partitions
  • Changes to access control
  • Relocation of equipment or displays
  • Changes to evacuation routes
  • Conversion of rooms to different uses

An exit sign may remain electrically operational but no longer indicate the correct direction after a layout change. Maintenance records should therefore address both operating performance & physical suitability.

Retain Contractor Reports & Competency Details

Facility managers should retain service agreements, contractor reports, repair quotations, invoices, certificates & correspondence relating to identified defects.

The contractor’s business details and the technician responsible for the work should be clearly stated on each service report.

The agreed scope of work should also be retained. This confirms whether the service included only a battery discharge test or also covered visual inspections, cleaning, asset verification, defect reporting & logbook updates.

Where several contractors provide services across a property portfolio, a standard reporting template should be used so that results can be compared consistently.

Store the Logbook Where It Can Be Accessed

The City of Perth guide states that the maintenance logbook for public-building emergency evacuation lighting should remain on the premises. A digital system can improve reporting and backup, but relevant records should still be readily accessible to authorised employees, contractors & inspectors when required.

A controlled record system should include:

  • A current on-site logbook or accessible digital equivalent
  • Secure cloud or server backup
  • Consistent file naming
  • Version control for building plans
  • Restricted editing permissions
  • Retention of superseded plans
  • Scheduled record reviews
  • A documented handover procedure

Facility managers should avoid relying on one contractor’s online portal as the only storage location. Copies should remain under the building owner’s or facility manager’s control.

Conduct Periodic Documentation Audits

At least once a year, facility managers should compare the physical assets, service records, drawings & defect register.

The audit should confirm that:

  • Every physical fitting appears in the asset register
  • Every registered asset can be located
  • Routine testing dates are complete
  • Failures have documented corrective actions
  • Completed repairs have retest evidence
  • Plans match the current building layout
  • New installations have commissioning records
  • Future service dates have been scheduled

Documentation audits are particularly valuable for shopping centres, warehouses, offices, healthcare facilities, schools, hospitality venues & multi-tenancy properties where layouts and occupants may change regularly.

Build a Reliable Exit Sign Record System

Effective documentation gives facility managers a clear history of each exit sign from installation through testing, repair & replacement. It also supports maintenance decisions, contractor management & timely responses to system defects.

For facilities managing emergency lighting Perth, the core records should include an asset register, approved plans, commissioning documents, routine test results, defect logs, repair evidence, battery history & current contractor reports.

When sourcing Fire safety products Perth, retain product specifications, warranties, invoices & installation records so that every system change can be traced.

Accurate records do not replace inspection and maintenance. They ensure completed work can be verified, outstanding risks can be managed & the building’s exit sign system remains supported by clear compliance evidence.